The Crimping machine can produce different types of =harness, among which cable belongs to a large category, it can process different connections for cables. Now, Shenzhen Rijing JMK will introduce to you the process of producing cable with terminal crimping machine:
How to produce cable harness by crimping machine.
I. stranding process.
A) check the single-line diameter before going online, and the single-line diameter error should be within the scope of the technical rules.
B) to check the appearance quality of the single line, it should be smooth, oil-free, no severe mechanical damage, and no severe oxidation of copper wire.
C) check the selected pressing wheel, wood mold and steel mold, which should conform to the technical rules.
D) check the number of stranded strands, arrangement, stranding pitch and stranding direction, which shall be in accordance with the technical rules.
E) to view the geometric dimensions of the stranded compression wire core, which should be in line with the technical rules.
F) it mainly depends on the quality of the wire harness, such as appearance, material texture, burr and so on.
G) check the single-wire joint and request that the welding is necessary, and the interval between the two joints should not be less than 300mm.
H) check the cable quality, the request is flat, no interspersing, no pressure stack.
crimping machine manufacturer.
II. Insulation process.
A) check whether the selected mold is in line with the technical rules.
B) check the insulation thickness, the average value of six points and the thinnest point should be in line with the technical rules.
C) for incoming materials, check whether the specifications meet the requirements, find out the relevant data according to the law, and edit the standardized documents according to the production needs.
D) check the quality of the insulation, request good plasticizing, appearance lubrication, blind visible bubbles, impurities, cracks.
E) check the quality of the extruded package, request the insulating layer to be tightly squeezed on the conductor, and the appearance of flattening, bruising, drum, loose sleeve and pleating is not allowed.
F) check the implementation of the spark test and request that all insulation cores need to undergo the spark test, and the test voltage should be in line with the technical rules.
G) the insulating wire core broken by the spark test must be rewound and repaired, and the spark test should be carried out again, otherwise it is not allowed to be cheap.
H) check the quality of the layout, the request is flat, no interspersing and pressing.
Crimping machine manufacturer.
III. Cross-linking process.
A) check whether the selected mold is in line with the technical rules.
B) check the thickness of internal and external semiconductors, and their thinnest points should be in line with the technical rules.
C) check the insulation thickness and request that each axis cable should be checked, and its average value and thinnest point should conform to the technical rules.
D) the cross-linking degree test should be carried out for each axis cable, and the experimental results should conform to the technical rules.
E) check the appearance quality of the insulation, request a flat appearance, no slubs, no bubbles and impurities.
F) check the external semiconductor appearance quality, request lubrication, flat, no impurities, wrinkles, scratch marks.
G) check the quality of the cable arrangement, the request is flat, no interspersing and pressing.
IV. Shielding process.
A) to check the number, direction and stacking rate of copper strip winding, it should conform to the technical rules.
B) check the quality of the package, the request is flat and tight, and there should be no wrinkling, crimping, missing or bruising.
C) check the welding quality of copper strip and request that the welding of copper strip joint is necessary.
D) check the quality of the cable, the request is flat, no interspersing and pressing.
V. Cable forming process.
A) check the arrangement, pitch and direction of the insulation core of the cable, which should conform to the technical rules.
B) to check the standard scale, number of layers and mode of winding, which should be in accordance with the technical rules.
C) check the appearance quality of the finished cable, request that the winding tape is tight, without the appearance of discount, damage or leakage; the filling should be full, the appearance of the cable is round, and the non-roundness conforms to the technical rules.
D) check the quality of the cable, the request is flat, no interspersing and pressing.
VI. Barrier sleeve.
A) check whether the selected mold is in line with the technical rules.
B) check the thickness of the barrier sleeve, the thinnest point should be in line with the technical rules.
C) check the appearance quality of the barrier sleeve, request round, do not have the appearance of loose sleeve, drum bag or missing bag.
D) check the quality of the cable, the request is flat, no interspersing and pressing.
7. Armour process.
A) to check the standard scale, number of layers, winding direction and winding gap of steel strip, it should conform to the technical rules.
B) check the welding quality of steel strip, request that the joint of steel strip should be welded, the joint should be flat and firm, and there should be no burr, warping edge or hole.
C) check the quality of the package, request round and tight, do not show the appearance of missing package.
D) check the quality of the cable, the request is flat, no interspersing and pressing.
VIII. Outer sheath.
A) check whether the selected mold is in line with the technical rules.
B) check the thickness of the jacket, and the thinnest point should be in line with the technical rules.
C) check the quality of the coating, no poor plasticizing, charring, air bubbles or impurities.
D) check the appearance of the sheath and request the sheath to be tightly squeezed on the cable core, with a round and lubricated appearance, no flattening, loose sleeves, drum bags, leaking bags and scratches.
E) check the cable identification symbol, request clear handwriting, connection, content in line with technical and plan requests.
F) check the implementation of the spark test, request the sheath of the armored cable to go through the spark test, and the test voltage conforms to the technical rules.
G) check the cable quality, the request is flat and there is no interspersing.
In a word, the main process of cable production by terminal machine is stranding process-"insulation process -" cross-linking process-"shielding process -" cable forming process-"barrier sleeve -" armour process-outer sheath. Of course, there will be different production details for different cables. If there are special parts that need to be operated independently, you can customize the terminal machine with us.